This company has no active jobs

BLACK ROCK MINING LIMITED

Black Rock Mining Limited (ASX:BKT) is focused on developing its Mahenge Graphite Project, which holds the largest high-grade flake graphite resource in Tanzania – the fourth largest contained graphite resource in the World. Following positive scoping study results released in March 2016, Black Rock released its preliminary feasibility study (PFS) with outstanding results – refer to ASX announcement from 24 April 2017. The PFS will now roll directly into a DFS. A global Total JORC Resource of 203Mt at Mahenge contains nearly 16Mt of graphite at an average grade of 7.8% TGC (total graphite contained), and includes a high grade proportion of 38Mt at 9.9% TGC. JORC Ore Reserve of 48.3Mt at 8.7% TGC. Initial 32 year LOM is less than half of the contained graphite.
Information
  • Company Phone +61 8 9320 7550
  • Address Line 1 Level 1, 35 Havelock Street, WEST PERTH, WA, AUSTRALIA,
  • City West Perth, WA, Australia
  • State Western Australia
  • Country Australia
  • Postcode 6005
  • Industry Materials
Connect with us

Hi! How can we help you?

Click below button to start chat

Chat Icon
chat icon